Duties:Panel Installation:Install SCADA (Supervisory Control and Data Acquisition) control panels and pump controllers in designated locations within municipal water, wastewater and stormwater systems. Follow engineering drawings, layout plans, and i Technical, Installer, Controller, Installation, Equipment, Electrical, Manufacturing, Technology